The SD-WAN Edge 2000 offers:
Follow the steps below to install the VMware SD-WAN Edge 2000 in the standard configuration.
Connect the two removable power modules located on the back of the Edge to AC power outlets. When the Edge powers ON, the LED on each power supply should be green and the fans should fully engage.
Note: An alarm sounds until BOTH power modules are plugged into the active AC power.
If the Edge does not power on immediately, remove the front bezel using the enclosed cylindrical key.
Once the front bezel is removed, press the power button (located on the right-hand corner of the front panel on the Edge).
Connect the Edge to an available Internet connection, and then connect the Ethernet cable to any of the available ports labeled GE3 to GE6.
Note: The VMware SD-WAN Edge is configured by default to acquire a DHCP IP address from the ISP on the WAN (uplink).
If you received an email from your IT administrator, follow the instructions in the email to complete the Edge activation.
Connect local devices such as desktops and switches to either of the ports labeled GE1 or GE2.
The sections below describe optional advanced activation configurations that support the Edge activation Quick Start Guide that is shipped with the Edge.